Deployed TDRS 7. Payloads: Tracking and Data Relay Satellite (TDRS) G/ Inertial Upper Stage (IUS); Bioreactor Demon-stration System (BDS) B; Biological Research in Canisters (BRIC); Commercial Protein Crystal Growth (CPCG); Hand-Held, Earth-Oriented, Real-Time, Cooperative, User-Friendly, Location-Targeting and Environmental System (HER-CULES); Microcapsules in Space (MIS) B; Physiological and Anatomical Rodent Experiment (PARE)/National Institutes of Health (NIH) Rodents (R); Radiation Monitoring Experiment (RME) III; Shuttle Amateur Radio Experiment (SAREX) II; Space Tissue Loss (STL)/National Institutes of Health (NIH) Cells (C); Military Applications of Ship Tracks (MAST); Visual Function Tester (VFT) 4; Window Experiment (WINDEX). Through the deployment of TSS, the tether broke and the satellite was misplaced. Retrieved CRISTA-SPAS. Payloads: Atmospheric Laboratory for Applications and Science (ATLAS) 3, Cryogenic Infrared Spectrometers and Telescopes for the Atmo-sphere (CRISTA)-Shuttle Pallet Satellite (SPAS) 1, Experiment of the Sun for Complement-ing the ATLAS Payload for Education (ESCAPE) II, Inter-Mars Tissue Equivalent Proportional Counter (ITEPC), Shuttle Solar Backscatter Ultraviolet (SSBUV) A, Physiological and Anatomical Rodent Experiment (PARE/NIH-R), Protein Crystal Growth (PCG-TES and PCG-STES), Space Tissue Loss (STL/NIH-C-A), Shuttle Acceleration Measurement System (SAMS), Heat Pipe Performance (HPP). Beside the two satellite retrievals, the mission included two spacewalks..

Rendezvoused and docked with Mir area station on November 15. Delivered the Russian-constructed 316GK Shuttle-Mir docking module to Mir.Payloads: Shuttle-Mir Mission 2; docking module with two connected photo voltaic arrays; IMAX Cargo Bay Camera (ICBC); Glow Experiment (GLO-4)/ Photogrammetric Appendage Structural Dynamics Experiment (PASDE) Payload (GPP); Shuttle Amateur Radio Experiment (SAREX) II. After undocking from Mir on July 4, Atlantis spent a number of days on orbit, carrying out medical research work with the Spacelab-Mir module in the cargo bay. On September 26 Atlantis closed its payload bay doors, and at 11:06 GMT fired its OMS engines for a 3 minute long deorbit burn. Payloads: Space Radar Laboratory (SRL) 1; Consortium for Materials Development in Space Complex Autonomous Payload (CONCAP) IV; three getaway particular (Gas) payloads; Space Tissue Loss (STL) A, B; Visual Function Tester (VFT) 4; Shuttle Amateur Radio Experiment (SAREX) II. Atlantis undocked from the Mir complex on September 23 at 23:33 GMT. Astronaut John Blaha relieved Shannon Lucid as NASA resident on the complicated.

Shuttle-Mir Mission 3. Docked with the Mir house station 24 March 1996; Shannon Lucid was left on Mir for an prolonged stay. On September 19 Atlantis docked with the Russian Mir space station. 1995 September 7 – . 1995 July 13 – . Carried SIR-C SAR. Landed at Edwards Air Force Base on October 11. Payloads: Space Radar Laboratory (SRL) 2, five Getaway Special payloads, Chromosome and Plant Cell Division in Space (CHROMEX) 5, Biological Research in Canisters (BRIC) 01, Cosmic Radiation Effects and Activation Monitor (CREAM), Military Application of Ship Tracks (MAST), Commercial Protein Crystal Growth (CPCG). Carried Astro 2 astronomy payload with three UV telescopes.(hooked up to Endeavour).Payloads: Ultraviolet Astronomy (ASTRO) 2; Middeck Active Control Experiment (MACE); Protein Crystal Growth-Thermal Enclosure System (PCG-TES) 03; Protein Crystal Growth-Single-Locker Thermal Enclosure System (PCG-STES) 02; Commercial Materials Dispersion Apparatus Minilab/Instrumentation Technology Associates, Inc. Experiments (CMIX) 03; Shuttle Amateur Radio Experiment (SAREX) II; two getaway special experiments. Payloads: International Microgravity Laboratory (IML) 2, Orbital Acceleration Research Experiment (OARE), Commercial Protein Crystal Growth (CPCG), Air Force Maui Optical Site (AMOS), Military Applications of Ship Tracks (MAST), Shuttle Amateur Radio Experiment (SAREX). Payloads: United States Microgravity Laboratory (USML) 2, Orbital Acceleration Research Experiment (OARE)..

On Monday night time, The Intercept revealed it had received 900 pages of documents detailing the work of EcoHealth Alliance, the U.S.-based mostly firm that acquired NIH grants to conduct bat coronavirus analysis in Wuhan, China – the place COVID-19 seemingly originated. Payloads: Lidar In-Space Technology Experiment (LITE), Shuttle Pointed Autonomous Research Tool for Astronomy (SPARTAN) 201-II, Robot-Operated Materials Processing System (ROMPS), Shuttle Plume Impingement Flight Experiment (SPIFEX), getaway particular (Gas) bridge assembly with ten Gas experiments, Trajectory Control Sensor (TCS), Simplified Aid for EVA Rescue (SAFER), Solid Surface Combustion Experiment (SSCE), Biological Research in Canisters (BRIC) III, Radiation Monitoring Experiment (RME) III, Military Applications of Ship Tracks (MAST), Shuttle Amateur Radio Experiment (SAREX) II, Air Force Maui Optical Site (AMOS) Calibration Test. Payload: Discovery F19 / Spartan / LITE. Payload: Endeavour F09 / Spartan / WSF. Payload: Atlantis F17 / External Airlock/ODS. Spacecraft: Endeavour. Duration: 11.24 days. Spacecraft: ODERACS. Decay Date: 1995-03-02 . Duration: 10.14 days. Decay Date: 1996-09-25 . Decay Date: 1995-07-22 . Spacecraft: Endeavour. Duration: 16.63 days.